Attic Insulation Upgrade in Orem
The low roof edge and diagonal framing were important details in this Orem attic upgrade.

Reaching the lower edges around the bracing
We prepared the access area before bringing in the hose. From there, the work had to reach beyond the open space near the hatch and into the shallower areas beside the roof framing.
We distributed the loose-fill insulation around the bracing and checked the depth with attic rulers. The ruler and framing provide useful reference points while the crew works, but we also track the material installed against the planned coverage.
As we moved through the attic, we leveled the insulation rather than leaving separate mounds. We finished by removing our equipment, collecting loose insulation, and cleaning the work route and access area.
Project photos document the installation; no specific R-value or utility-savings result is claimed from photos alone.
What customers say
Read all 45 Google reviews →Feedback from another Interwest customer.
They are fast and do a great job. I would hire them again.